Sol-by-sol Summary


Sol 49  Extended "Snow White" trench by 15 centimeters. SSI documentation of TECP and rasp on the robotic arm. RA actuator characterization; AFM diagnostics.

Sol 48  Image RA at Alice, remote sensing, night imaging. Coordinated atmospheric observations with the Mars Reconnaissance Orbiter.

Sol 47  Document TECP extraction. "Midnight Sun" imaging begins. Load plate & rasp test,

Sol 46  Image of the Thermal and Electro-Conductivity Probe in soil. Monitor Dodo-Goldilocks. Night image test.

Sol 45  More scraping at Snow White; remote sensing targeted observations

Sol 44  Finished Atomic Force Microscope checkout. Remote sensing. RAC imaging under the lander at "Snow White" and "Holy Cow." TEGA calibration run completed.

Sol 43  WCL sol B analysis. Successful TECP insertion: TECP is in ground! AFM confirmed touches – frequency tests came down positively. More scraping at Wonderland. Finishing up Mission Success Panorama "Peter Pan."

Sol 42  Clean and scrape Wonderland, RAC divot monitoring, AFM checkout part 1.

Sol 41  Deliver “Sorceress” sample to WCL, WCL sol A analysis; RA TECP needle touch test.

Sol 40  Independence Day stand-down; Remote Sensing